  • #5873
    Marc
    Participant

      Evening folks, we’re fresh back from a little jaunt to Porlock Wier to pick up some lovely stainless steel beaching legs for Merganser, the same fella had some very nice T rail too so we swagged that to make some new jib rails and upgrade the traveller to something a little more beefy. Buying the legs this early has several benefits, they are so much easier to fit into a bare hull and when I put the shelves in I can make sure the access to the main 20mm bolt for removing them is left accessable. I’ve got 5 days off work coming up so weather permitting we should be cracking on with getting the last of the core strengthening in the bow and moving on to building the anchor locker and v berth