I noticed it’s been a while since my last update, I have been getting stuff done but not documenting that much, we’ll start with the major job, the encapsulated keel has separated from the concrete that encases the ballast so that’s currently being dug out as its been full of water (pic of 2 holes is the bottom of the keel to drain it out) so that’s fun! The engine has now been completely stripped and every washer, o ring, seal and bearing is going to be replaced, along with several other components so the engine will be like new. I’ve done the design for the new mast hinge and quotes are coming back for that. So progress is being made and after the new concrete goes in its full steam ahead for the rebuild!
This topic was modified 4 years, 5 months ago by Louis.
This topic was modified 4 years, 5 months ago by Louis.